TRAVERSE Global v11.1

Master Schedule View

Use the Master Schedule View function to verify an assembled item’s current master schedule against the existing sales orders, sales forecasts, and work orders already in the system. This function does not show any moving availability but does show the current information in the system. The master schedule does not show activity prior to the current day.

Keep in mind that sales forecast quantities for kits affect the master schedule for any assembled items included in the kit. However, kits themselves do not have master schedules because kits are not stocked but are assembled at point of sale.

To use this function, select Master Schedule View from the Interactive Views menu. The Master Schedule View screen appears and lists master schedule information for the first BOM item ID on file in the RP system.

After arranging and sorting the columns how you want to view the information:

Use the Preview Report button to view a preview of the information as a report. To print the report, click the Print button or to export the report to a PDF, HTML, MHT, RTF, Excel, CSV, Text, or Image File, click the Export Document button.

Use the Export Data button to export and save the data as an HTML, XML, plain text, or Microsoft Excel document.
Note: Depending on the output type selected, the information may export exactly as it appears on the screen, including column widths and expanded or collapsed grouped entries.

Use the Views button to save the current parameters set for the interactive view for using at a later time. You can also use the button to select, edit, or delete from the multiple saved views.

Use the Reset Layout button to reset the column headings and any sorting changes made to the information table.

See the Interactive View Overview for a basic understanding of interactive views and to view movies outlining the different types of interactive views.